PKB Logo
  • Welcome to Kampong Bharu Development Corporation (KBCorp)

  •  MAKLUMAN : Penutupan Jalan Bagi Pemasangan Khemah 'Marquee Tent' Bazaar Ramadhan Kampong Bharu bermula tarikh : 21/05/2017 masa : 10.00 p.m hingga 5.00 a.m 

  •  Klinik Penyelesaian Harta Pusaka sesi JUN pada 15 & 22 JUN 2017 (Khamis), Jam 10.00 pagi hingga 4.30 petang di Pejabat PKB. Sila Klik Disini.

  •  Flyer Informasi Penggunaan Produk Biodegradasi di Wilayah Persekutuan. Sila Klik Disini.

  • New Pasar Raja Bot now with a new look. " More Organized and Clear." Feel free to Visit Pasar Raja Bot in Kampong Bharu.

  • ¬†Pengumuman kepada Pemilik / Pewaris Tanah di Kampong Bharu, anda boleh mengemaskini maklumat anda¬†di sini¬†.

  • Baru  Bagi yang berminat untuk membeli Buku Pelan Induk Terperinci Pembangunan Kampong Bharu, Sila datang ke pejabat kami di PKB. Harga adalah amat berpatutan, bagi softcover harga yang ditawarkan adalah RM200 sahaja manakala bagi hardcover pula ditawarkan pada harga RM250 sahaja. Jika terdapat sebarang pertanyaan, hubungi kami di talian : 03-2692 6733.

Dealing The Redevelopment of Kampong Bharu Beyond 2020

Within the framework of bringing Kampong Bharu to develop along with the development of the golden triangle, it is such a complex initiative. Major issues related to the development of Kampong Bharu are as follows:

1Kampong Bharu experience a decrease in population since 1991 where the total population in 1991 was 20,215 compared with 2000 with 15,718 people. It is estimated that the total population will reach 17,000 in 2010.

Comparison between 2010 and 1991 showed that there was a decrease of 16% within that period.

Apart from that, there was an issue of a high number of non-citizen population which was about 2,670 people in 2000.

 

2An ‘adhoc’ land development has caused Kampong Bharu to look like the ‘back yard / “stressed built environment” of the surrounding development due to its crowded environment.

Furthermore, the absence of a clear distance between residential buildings, built close to each other creates an unpleasant environment.

 

3Majority of the ownership of land is private ownership. A total of 1381 lots were recorded by the Office of the Director of Lands and Mines, Federal Territory of Kuala Lumpur.

The number of landowners is 4,300 and the average ownership (31%) belongs to 5 owners for one lot with 143 people as the highest number of ownership per lot.

This shows that the land ownership in Kampong Bharu is multiple ownership.

4Small/narrow lots make it difficult for high intensity development. This encourages small-scale development and less optimal return to landlord/building owner.

It is estimated that 89% of the lots in Kampong Bharu have less than 1100 sqm (11840 sq ft) of area.

5No direct link to KLCC either by road or walkway and the shortcoming in optimising the potentials available in the vicinity has caused Kampong Bharu to get minimal impact in terms of fulfillment of urban activities, accessibility and greenery chains.

6The problem of flash flood in several locations like Kampong Periok, Dang Wangi and Sultan Sulaiman is caused by imperfect existing drainage and irrigation infrastructure.

KWPKB DBKL perbadanan putrajaya PL MSWP MYGOV MAMPU MSC 

PERBADANAN PEMBANGUNAN KAMPONG BHARU (PKB)
Aras Bawah, 1 & 2, Lot 61 Rumah Rohas, Jalan Raja Abdullah,
Kampong Bharu, 50300 Kuala Lumpur


Phone  Hotline : +603–2692 6733
Fax  Fax : +603–2693 4733
Email  Email : webmaster[at]pkb[dot]gov[dot]my                                    pertanyaan[at]pkb[dot]gov[dot]my
 

 

Follow Us at:

Last Updated: June 22, 2017 @ 4:31 pm

Disclaimer : The Government of Malaysia, Ministry of Federal Territories and PKB are not responsible for any loss or damage arising from the use of information on this website.